Ocean Pointe
New construction of over 900 units
in combinations, new construction of six unit types in four building
designs. A major element of design included the lack of common element
metering, which has the potential for saving the homeowner’s association
several thousand dollars per month. (Est. construction cost:
$200,000,000) Ewa Beach, Hawaii.
Ewa Villas Bachelor Quarters
Renovation of historic
plantation-style 30-unit bachelor housing to comply with modern codes
and requirements. Included new power service, individual unit metering
and addition of cable TV and telephone wiring. (Est. construction cost
$2,200,000) Ewa Beach, Hawaii.
Waikiki Landmark*
The innovative exterior lighting
design was used to evenly illuminate they interior of the arch with the
use of metal halide luminaires. Waikiki, Hawaii
*Designed by Douglas Buhr and Myron
Hudson while employed by Douglas V. MacMahon Ltd.
Marin Tower*
The power distribution in this
building was designed at 12.47 KV with Hawaiian Electric meters provided
for each apartment. Honolulu, Hawaii.
*Designed by Douglas Buhr and Paul
Uyeda while employed by Douglas V. MacMahon Ltd.
Outrigger
Renovation of an occupied hotel
with complete electrical service entrance replacement. Waikiki, Hawaii.
Seaside Suites
An existing hotel was converted
into a condominium. Waikiki, Hawaii.
BEQ Building 1334
Conversion of a three-story
concrete block walk-up with studio apartments into two bedroom units.
The electrical system was completely replaced, from the service to
branch devices. Air conditioning was added, and concerns about the
capacity of the existing substation had to be addressed. The design did
not take away any living space, unlike other designs which assigned one
of the units as an electrical room. (Est. construction cost: $1,400,000)
Pearl Harbor, Hawaii.
Yamada Residence
Remodeling of a large single family
dwelling of more than 5,000 square feet. The service was expanded to 400
amps to take care of the needs of the many interior and exterior load
demands. Creative lighting was stressed. (Est. construction cost:
$200,000) Honolulu, Hawaii.
Building 1335
Parametric cost estimating,
including conceptual design. A three-story walk-up with about 80 units.
Needed to replace a 225 KVA 120/208 volt substation with 480/277 KVA,
120/208 volts. The project was a fast turn-around job, with less than
five days from start to finish. (Est. construction cost: $15,000,000)
Pearl Harbor, Hawaii.
VA Domiciliary 203S
Complete modernization of wing,
fitting new electrical requirements into old envelope. Project included
analysis of existing power system, upgrading it as required by the
contract without destroying it. (Est. Construction cost: $737,000) White
City, Oregon.
The Cliffs
Comprehensive electrical
investigation in the wake of Hurricane Iniki to determine the extent of
latent damage which had pierced the envelope of the buildings. Took
meticulous random samples of electrical devices, photographically
documenting the different stages of corrosion and correlating the
severity of the corrosion and the breach. An extensive report was filed.
(Est. construction cost: $6,000,000) Princeville, Hawaii.
Misawa Air Base
Due to uninsulated roogs, melted
snow was running off the roofs and forming very large icicles off the
edge of the roofs. Designed a roof heating system, which in conjunction
with new guttering, would relieve the problem and allow the roofs to
remain clear and the ice problem to be ameliorated. (Est. construction
cost: $921,000) Japan.
Javna Residence Remodel
MacMahon Residence Remodel
Meadow Wood Apartments
Edmund Ching Apartments New
Service Entrance
Mark Gentry Residence Remodel
Manuel Residence Lighting
Harrow Residence Electrical
Drawings
Lowe Residence
Ah Yat Residence
Browning Residence
Davenport Residence